Lou Brooks
Georgetown Hospital
2000 Scenic Drive
Georgetown , Texas 78626
Dear Mr. Brooks,
We have measured the current draw of your chillers before and after Frigi-Tech oil treatment was added. The results are impressive:
Before Frigi-Tech oil treatment:
Phase 1 Phase 2 Phase 3
140 145 135
After Frigi-Tech oil treatment:
Phase 1 Phase 2 Phase 3
124 128 122
((((15 Amps) X (460 Volts) X (1.732))/1000) X
24 Hrs/Day X 365 Days/Yr.
104,689 KWH
104,689 KWH/Yr. X $.0718 = $7,516.67 savings per year on the lead chiller.
(((15 Amps) X (460 Volts) X 1.732))/1000) X 3 Hrs/Day x
365 Days/Yr.
13,086 KWH
13,086 KWH/Yr. X $.0718 = $939.57 savings per year on the lag chiller.
Total Annual Savings = $7,516.67 + $939.57
= $8,456.24
We are very pleased with the savings at Georgetown Hospital.
Respectfully,
R. J. Morris C.E.M.
Director of Energy Management
SINCE 1922
P.O. Box 2689 - 306 East Avenue Austin, Texas
78768 - (512) 472-5042